benchgap
Calibration

AIME26 → AIME 2025

AIME 2025 is estimated from AIME26 with a Hill curve fitted on 6 models measured on both: y = 0.3858 + (1.1490 − 0.3858)·x^6.00 / (0.79247^6.00 + x^6.00), R² = 1.00, cross-validated error 1.5 pp. It is used for 23 estimates.

Estimated modelAIME26AIME 2025Source
A.X K297.1%97.5%estimated ± 1.5 pp, low confidence
Claude Opus 4.595.1%95.8%estimated ± 1.5 pp, medium confidence
Gemma 4 12B77.5%74.2%estimated ± 1.5 pp, medium confidence
GLM-595.8%96.4%estimated ± 1.5 pp, medium confidence
GLM-5.195.3%95.9%estimated ± 1.5 pp, medium confidence
GLM-5.299.2%99.2%estimated ± 1.5 pp, low confidence
Inkling97.1%97.5%estimated ± 1.5 pp, low confidence
Inkling-Small95.5%96.1%estimated ± 1.5 pp, medium confidence
K-EXAONE 2.092.3%93.1%estimated ± 1.5 pp, medium confidence
Kimi K2.696.4%96.9%estimated ± 1.5 pp, low confidence
Ling 3.0 Flash93.2%94.0%estimated ± 1.5 pp, medium confidence
LLaDA2.2-mini35.1%39.1%estimated ± 1.5 pp, low confidence
LongCat-Flash-Lite-Sparse65.7%57.3%estimated ± 1.5 pp, medium confidence
Muse Glimmer 30B94.7%95.4%estimated ± 1.5 pp, medium confidence
Qwen3.5 397B93.3%94.1%estimated ± 1.5 pp, medium confidence
Qwen3.6-27B94.1%94.8%estimated ± 1.5 pp, medium confidence
Qwen3.6-35B-A3B92.7%93.5%estimated ± 1.5 pp, medium confidence
Qwen3.6 Plus95.3%95.9%estimated ± 1.5 pp, medium confidence
Beam97.8%98.1%estimated ± 1.5 pp, low confidence
Solar Open 295.7%96.3%estimated ± 1.5 pp, medium confidence
Solar Pro 495.3%95.9%estimated ± 1.5 pp, medium confidence
ZAYA1-74B-Preview76.4%72.6%estimated ± 1.5 pp, medium confidence
ZAYA1-8B89.1%89.6%estimated ± 1.5 pp, medium confidence